$2.41T
Annual U.S. cost of poor software quality (2022).
This is the macro problem. Contract and compatibility failures are part of this loss profile.
CISQ (2022)
Market Reality
Most IT organizations do not fail from one dramatic event. They fail from compounding compatibility debt: one breaking change, one rollback, one firefight at a time.
Mortar is not a Band-Aid workflow. Mortar is systemic intervention: Insight, Foresight, and Authority before production impact.
$2.41T
Annual U.S. cost of poor software quality (2022).
This is the macro problem. Contract and compatibility failures are part of this loss profile.
CISQ (2022)
10-20%
Technology budget for new products can be diverted to debt remediation.
Budget you planned for growth gets reassigned to cleanup and stabilization.
McKinsey
20-40%
Share of technology estate value that can be consumed by technical debt.
This is enterprise drag at the platform layer, not an edge case.
McKinsey
54%
Significant outages costing more than $100K.
When contracts drift and releases are ungated, outage economics become a board-level issue.
Uptime Institute (2023)
16%
Significant outages costing more than $1M.
A subset of incidents are catastrophic, not just noisy.
Uptime Institute (2023)
Proof of Authority
This is how Mortar visualizes structural drift findings. Every finding is tied to a concrete location in your OpenAPI spec and assigned a deterministic safety classification.
Comparing petstore-v1.yaml vs petstore-v2-draft.yaml
Required operation 'getPetById' was removed from the specification.
Field 'id' type changed from 'integer' to 'string'.
New required field 'category' was added without a default value.
Why Buyers Act
Existing stacks observe incidents, test fragments, or document interfaces. Mortar adds the missing layer: deterministic release authority over contract drift.